New 12v 7.2ah Long (Lead-Acid) UPS Battery

For sale by: MD. Abdur Rahman Nayan, 19 Jan 2021 06:27 am Location: Dhaka, Dhaka, Jatrabari

  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
Tk 1,600

01678761887

Negotiable

Shere This Ad:
                                            Product details of 12v 7.2ah Long (Lead-Acid) UPS Battery ( Excellent Backup-Long 7Ah/12V Lead-Acid) 12v 7.2Ah

Battery Type – 12V 7.2Ah batteries
Ease of mind – Maintenance-free operation.
Used for back up solutions
User-friendly – easy installation with a very durable and rugged construction
Trusted and highest reviewed sealed lead acid batteries
Long service life, float or cyclic applications
Very Low self-discharge
Absorbent Glass Mat (AGM) & GEL technology
Battery Type – 12V 7.2Ah batteries
Ease of mind – Maintenance-free operation.
Used for back up solutions
User-friendly – easy installation with a very durable and rugged construction
Trusted and highest reviewed sealed lead acid batteries
Long service life, float or cyclic applications
Very Low self-discharge
Absorbent Glass Mat (AGM) & GEL technology
Specifications of 12v 7.2ah Long (Lead-Acid) UPS Battery ( Excellent Backup-Long 7Ah/12V Lead-Acid) 12v 7.2Ah
Brand

No Brand

SKU

131948963_BD-1052570643

What’s in the box

1

Product details

Manufacturer : Long

ASIN : B081VFQHVP

Item model number : WP7-1

External Product ID : NA
Compatible with : Multi
External Product ID Type : Not Available
Battery Model Number : WP7-12
Rechargeable : Yes
Battery Capacity : 7 - 7.5 amp_hours
Brand : Long
Made in Vietnam

SHOP NAME: NIIT COMPUTER JATRABARI (NAYAN),

ADDRESS: 45/1, WEST JATRABARI (NEARBY JOSNA HOTEL/GOOGLE SEARCH SUBORNA DENTAL NEAR MY SHOWROOM), DHAKA-1204,

CONTACT: MD. ABDUR RAHMAN (NAYAN),অল বাংলাদেশ প্রোডাক্ট ডেলিভারি দেওয়া হয় ।
ফোন নাম্বার : 01678761887

OTHERS CONTACT(24-HOURS):- FACEBOOK/IMO/VIBER/INSTAGRAM/WHAT SUP/SNAP CHAT/ WE CHAT- MD.ABDUR RAHMAN (NAYAN)

INSIDE DHAKA AVAILABLE NOW HOME/OFFICE DELIVERY(24/48/72-HOURS) ON TERMS & OUTSIDE DHAKA DELIVERY IN S.A/JANANI/RAINBOW/SUDHORBAN ETC PARIBAHAN POSSIBLE (ALL ICT PRODUCT PRICE ALWAYS CHANGED)                                    

Similar ads


Mini UPS for wifi router and onu
Mini UPS for wifi router and onu

16 May 2024 09:20 pm

TK 1,590

Adata SSD 256 (NEW)
Adata SSD 256 (NEW)

01 Dec 2023 09:09 am

TK 1,550

Online Mini UPS
Online Mini UPS

26 May 2022 08:29 am

TK 1,550

K-Snake New Gaming Combo Full Fresh
K-Snake New Gaming Combo Full Fresh

30 Jan 2023 07:13 am

TK 1,550

Baseus E19 wireless airbud Brand New
Baseus E19 wireless airbud Brand New

26 Jan 2025 07:02 pm

TK 1,550

NEW High-grade Battery for Asus K43U 4400mAh, 6 cells
NEW High-grade Battery for Asus K43U 4400mAh, 6 cells

02 Aug 2023 07:47 am

TK 1,550

Shaving shaver machine new fr sale
Shaving shaver machine new fr sale

09 Feb 2021 08:42 am

TK 1,500

Nokia 6300(almost new)
Nokia 6300(almost new)

27 Oct 2020 04:59 pm

TK 1,500

Building(Condition New)
Building(Condition New)

16 Jun 2020 09:05 am

TK 75,000,000

New flat for sale in prime location In Mohammadpur.
New flat for sale in prime location In Mohammadpur.

26 Mar 2025 01:45 pm

TK 13,500,000

X corolla 2005 New Shape
X corolla 2005 New Shape

17 Jan 2024 11:01 am

TK 12,400,000

BANGLAMOTOR NEW ESKATON LAND SHARING FOR 1850 sft FLAT
BANGLAMOTOR NEW ESKATON LAND SHARING FOR 1850 sft FLAT

30 Jan 2021 06:37 am

TK 11,100,000

The best Tax lawyer in New Zealand bikrisohoj
The best Tax lawyer in New Zealand bikrisohoj

08 Apr 2025 08:52 pm

TK 9,700,000

Best luxury cruise travel agency in New Zealand bikrisohoj
Best luxury cruise travel agency in New Zealand bikrisohoj

22 Apr 2025 09:17 pm

TK 9,400,000

The best car accident lawyer in New Zealand bikrisohoj
The best car accident lawyer in New Zealand bikrisohoj

22 Apr 2025 09:21 pm

TK 8,900,000

The best Student loan provider in New Zealand bikrisohoj
The best Student loan provider in New Zealand bikrisohoj

26 Apr 2025 08:24 pm

TK 8,790,000

More ads from MD. Abdur Rahman Nayan


GIGASONIC 19 inch HD LED Monitor
GIGASONIC 19 inch HD LED Monitor

18 Jun 2020 07:33 pm

TK 3,900

Asus H61M-K DDR3 3rd Gen.LGA1155 Socket Mainboard (VGA)
Asus H61M-K DDR3 3rd Gen.LGA1155 Socket Mainboard (VGA)

18 Jun 2020 11:04 pm

TK 7,300

Refublised Desktop memory ram support DDR1 512MB
Refublised Desktop memory ram support DDR1 512MB

19 Jun 2020 09:15 am

TK 500

Refublised Desktop DDR1 1GB PC3200 DDR 400 MHZ 184-Pin RAM
Refublised Desktop DDR1 1GB PC3200 DDR 400 MHZ 184-Pin RAM

19 Jun 2020 11:15 am

TK 800

Replacement 40W HP Mini 210 Adapter Charger
Replacement 40W HP Mini 210 Adapter Charger

19 Jun 2020 11:15 am

TK 800

Replacement Dell Laptop Battery N4030 Capacity 5200 mAh
Replacement Dell Laptop Battery N4030 Capacity 5200 mAh

19 Jun 2020 11:16 am

TK 1,300

TP-Link WR845N 300Mbps Wireless N Router
TP-Link WR845N 300Mbps Wireless N Router

19 Jun 2020 11:16 am

TK 1,900

Refublised Desktop Bulk Asus P5KPL Motherboard
Refublised Desktop Bulk Asus P5KPL Motherboard

19 Jun 2020 11:17 am

TK 2,200

New Esonic Genuine G31 DDR2 motherboard
New Esonic Genuine G31 DDR2 motherboard

19 Jun 2020 11:18 am

TK 2,500

New Dell Inspiron N4050 14R Laptop Motherboard Intel
New Dell Inspiron N4050 14R Laptop Motherboard Intel

20 Jun 2020 07:46 pm

TK 7,000

Tp-link Archer c20 AC750 Dual Band Router
Tp-link Archer c20 AC750 Dual Band Router

21 Jun 2020 06:22 am

TK 2,500

Replacment HP Mini 19.5v 2.05a 40w AC Laptop Adapter
Replacment HP Mini 19.5v 2.05a 40w AC Laptop Adapter

21 Jun 2020 06:17 pm

TK 800

Tenda Model O3 5km Outdoor Point To Point CPE Pair
Tenda Model O3 5km Outdoor Point To Point CPE Pair

21 Jun 2020 06:22 am

TK 11,000

B450M DS3H AM4 AMD Micro ATX Motherboard
B450M DS3H AM4 AMD Micro ATX Motherboard

21 Jun 2020 06:20 pm

TK 8,200

AMD Ryzen 3 2200G Quad-Core Processor
AMD Ryzen 3 2200G Quad-Core Processor

21 Jun 2020 06:20 pm

TK 11,500

Dell E1916H 18.5 Inch LED Monitor (VGA+DP)
Dell E1916H 18.5 Inch LED Monitor (VGA+DP)

22 Jun 2020 06:18 am

TK 6,100